CarlsBad Caverns New Mexico 2012-2013 (Current Project)

Carlsbad Caverns New Mexico replace 3000ft of water line, then compact, and cover. create 3000ft of right of way, break 800ft of rock for unobstructed passage for other machinery.
read more

Clear Channel 2012

Clear Channel Radio. Objective Drill multiple 24″x 20′ deep holes for a retaining wall to secure a house above.
read more

Pasadena 2012

Jema Construction Inc. pasadena custom home, multiple 24″ caissons 18ft deep.
read more

Simi Valley Knolls 2012

Simi Valley Knolls 2012 Digging Footings For A large Patio
read more

Corona Ca 2012

The Job Drill 7 Case ons for Brencon. No other machine could get there. The access was limited to steep for a crawler, and to narrow. The Case ons 18″x 14 ft, not sitting above, but below the holes to drill. That is a big disadvantage. The Menzi A71 was capable.
read more