Posted by admin on Dec 31, 2011 in Portfolio | 0 comments
The Task.
Reyes Construction needed to remove over burden material.
1.1 slope steep for any spider not winched off. Reyes Construction had tried to take a conventional excavator up the slope to remove the excess over-burden material, and blew the track tension seals. They sent a 550 dozer, and could not do the work either. At that moment they made the call to Hillside Equipment...
read more