CarlsBad Caverns New Mexico 2012-2013 (Current Project)

Posted by on Dec 28, 2012 in Portfolio | 0 comments

CarlsBad Caverns New Mexico 2012-2013 (Current Project)

Carlsbad Caverns New Mexico replace 3000ft of water line, then compact, and cover. create 3000ft of right of way, break 800ft of rock for unobstructed passage for other machinery.

read more

Clear Channel 2012

Posted by on Dec 28, 2012 in Portfolio | 0 comments

Clear Channel 2012

Clear Channel Radio. Objective Drill multiple 24″x 20′ deep holes for a retaining wall to secure a house above.

read more

Pasadena 2012

Posted by on Dec 28, 2012 in Portfolio | 0 comments

Pasadena 2012

Jema Construction Inc. pasadena custom home, multiple 24″ caissons 18ft deep.

read more

Simi Valley Knolls 2012

Posted by on Dec 28, 2012 in Portfolio | 0 comments

Simi Valley Knolls 2012

Simi Valley Knolls 2012 Digging Footings For A large Patio

read more

Corona Ca 2012

Posted by on Jun 19, 2012 in Portfolio | 0 comments

Corona Ca 2012

The Job Drill 7 Case ons for Brencon. No other machine could get there. The access was limited to steep for a crawler, and to narrow. The Case ons 18″x 14 ft, not sitting above, but below the holes to drill. That is a big disadvantage. The Menzi A71 was capable.

read more

Wood Ranch 2012

Posted by on Jun 19, 2012 in Portfolio | 0 comments

Wood Ranch 2012

Brush Clearing, Cactus Mulching (masticating), and 1000ft of trenching for irrigation.

read more

Ventura Harbor Rock Revetment 2012

Posted by on Feb 16, 2012 in Portfolio | 0 comments

Ventura Harbor Rock Revetment 2012

The Task is to use the Menzi A71 with the rotary grapple to place 1/4 ton rip rap. The Spider Excavator is the only machine that can safely walk on the 2to1 slope, and get any production. The task is a little daunting, but a good challenge.

read more

Simi Valley Knolls Footing Demolition 2011

Posted by on Dec 31, 2011 in Portfolio | 0 comments

Simi Valley Knolls Footing Demolition 2011

Sometime the neighbors just need a little help.

read more

Camp Pendelton Marine Weapons Range 2011

Posted by on Dec 31, 2011 in Portfolio | 0 comments

Camp Pendelton Marine Weapons Range 2011

The Task. Reyes Construction needed to remove over burden material. 1.1 slope steep for any spider not winched off. Reyes Construction had tried to take a conventional excavator up the slope to remove the excess over-burden material, and blew the track tension seals. They sent a 550 dozer, and could not do the work either. At that moment they made the call to Hillside Equipment Rental.

read more